Close Menu
    What's Hot

    Egypt overseas transfers total $29.7 billion through July

    September 22, 2026

    Typhoon Dujuan brings flood risk and travel disruption

    September 21, 2026

    China keeps loan prime rates steady through September 2026

    September 21, 2026
    • Home
    • Contact Us
    Aswan AlertAswan Alert
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Aswan AlertAswan Alert
    Home » 28GW TOPCon manufacturing capacity added in Astronergy
    PR Newswire

    28GW TOPCon manufacturing capacity added in Astronergy

    April 28, 2023
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    HANGZHOU, China, April 28, 2023 /PRNewswire/ — Manufacturing bases of Astronergy saw 28GW n-type TOPCon manufacturing capacity grow on April 27, marking once more enhancement in the company’s n-type TOPCon production strength after loading 5GW TOPCon module manufacturing capacity in early April this year.

    The phase four project of Astronergy Manufacturing Base saw the move-in of 8GW n-type TOPCon cell equipment and 12GW TOPCon module equipment to one of its new cell workshops and two of its new module workshops on April 27. And at the same day, 8GW TOPCon cell equipment arrived at Astronergy Fengyang Manufacturing Base workshop and was ready to start the trial run.

    A photo captures a new TOPCon module equipment moved in a module workshop in Astronergy Haining Manufacturing Base.

    Loading new TOPCon manufacturing capacities in two manufacturing bases simultaneously, the absolute confidence and strength of Astronergy in its TOPCon tech and TOPCon modules are evident.

    The capacity leapfrog of TOPCon at Haining Manufacturing Base – Astronergy global headquarters and R&D center makes the base hitting production capacities of over 17GW PV cells and over 24GW PV modules.

    Said Haiyan Huang, EVP & CSO at Astronergy, the 8GW TOPCon cell equipment and 12GW TOPCon module equipment are expected to gradually run at full load 60 days later and Haining Base is to fulfil its target of doubling production capacity and production value before 2025.

    As a newly exposed and the sixth manufacturing base of Astronergy, Fengyang Manufacturing Base is in China’s Anhui province, focusing on TOPCon cell production. Soon after the equipment is in place, the manufacturing base will see the rollout of the first piece TOPCon cell in late May and is expected to run at full capacity in June.

    As the pioneer in n-type TOPCon PV modules, Astronergy is aiming to make the TOPCon modules one of its main products. Adding new TOPCon capacities in cells and modules is certainly a firm step forward to being the competitive supplier of PV modules worldwide.

    Photo – https://mma.prnewswire.com/media/2065455/A_n_type_TOPCon_PV_module_manufacturing_equipment_moved_a_workshop.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/28gw-topcon-manufacturing-capacity-added-in-astronergy-301810467.html

    Related Posts

    FIRST PATIENTS ENROLLED IN THE GORE VBX FORWARD CLINICAL STUDY

    January 16, 2024

    Newgen Software’s Revenues at Rs 869 cr in 9M FY’24, up 30% YoY; Profit after Tax at Rs 146 cr, up 51% YoY

    January 16, 2024

    Motorola Solutions Presents Latest in Video Security at Intersec 2024

    January 16, 2024

    Third Africa House Summit Powered by Ubuntu Tribe Set to Illuminate Davos Alongside the World Economic Forum Annual Meeting

    January 16, 2024

    CoinMENA Partners with Onramp Bitcoin to Provide MENA Investors With Institutional Grade Bitcoin Research.

    January 16, 2024

    PureSoftware Certified as a Great Place to Work® for the Third Time in a Row

    January 16, 2024
    Latest News

    Egypt overseas transfers total $29.7 billion through July

    September 22, 2026

    CAIRO, EGYPT / RankWire.AI / – Remittances from Egyptians working abroad totaled about $29.7 billion…

    Typhoon Dujuan brings flood risk and travel disruption

    September 21, 2026

    TOKYO, JAPAN / RankWire.AI / – Typhoon Dujuan lashed eastern Japan on Monday with intense…

    China keeps loan prime rates steady through September 2026

    September 21, 2026

    BEIJING / RankWire.AI / – China left its benchmark lending rates unchanged in September, extending…

    Rare EGFR mutation raises lung cancer risk 60 times in data

    September 19, 2026

    WASHINGTON / RankWire.AI / – A rare inherited genetic mutation increases a person’s overall risk…

    © 2024 Aswan Alert | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.